PE WRE Study Plan
One route through the whole hub: ten weeks for a first attempt, four weeks for a retake, and a checklist for the final days. The whole plan is on this page — like everything on this hub, it is free in full.
Ten-week first-attempt plan
The full plan, with every week shown — nothing is held back. Each week: read the area pages, work the examples with the page covered, take each mini-quiz, and listen to the area podcasts on the move.
| Week | Areas | Cluster |
|---|---|---|
| Week 1 | Project Planning; Soil Mechanics | Ground and project |
| Week 2 | Materials; Analysis and Design | Ground and project / Treatment |
| Week 3 | Hydraulics — Closed Conduit | Water core |
| Week 4 | Hydraulics — Open Channel | Water core |
| Week 5 | Hydrology | Water core |
| Week 6 | Groundwater and Wells; Surface Water and Groundwater Quality | Water core / Treatment |
| Week 7 | Drinking Water Distribution and Treatment | Treatment |
| Week 8 | Wastewater Collection and Treatment | Treatment |
| Week 9 | Project Sitework | Ground and project |
| Week 10 | Mixed timed review across all 12 areas; weakest-area rebuild | Review |
Four-week retake plan
Week 1 — Diagnose by area
Map your previous result onto the 12 areas. The weakest two or three areas become the whole plan.
Week 2 — Rebuild the weak clusters
Work only those area pages: formulas, worked examples, traps, mini-quiz.
Week 3 — Timed mixed practice
Mixed questions across all areas against the clock, so strong areas do not decay.
Week 4 — Full simulation
One full timed simulation, a review of every miss by area, and light revision only in the final days — see the exam page.
All 12 area pages
Project Planning
Quantity take-off, cost estimating, schedules, and the economic analysis that decides between alternatives.
Area 2Soil Mechanics
Lateral earth pressure, consolidation, compaction, bearing capacity, settlement and slope stability.
Area 3Materials
Soil classification and boring logs, soil properties, concrete, piping materials and material test methods.
Area 4Analysis and Design
Mass balance, hydraulic loading and solids loading — the design arithmetic behind every treatment process.
Area 5Hydraulics — Closed Conduit
Energy, continuity and momentum; Hazen-Williams and Darcy-Weisbach; pumps, cavitation and pipe networks.
Area 6Hydraulics — Open Channel
Open-channel flow, subcritical and supercritical regimes, stormwater collection, culverts and energy dissipation.
Area 7Hydrology
Storm characteristics, rational and NRCS runoff, hydrographs, IDF relationships, time of concentration and stormwater management.
Area 8Groundwater and Wells
Aquifers, groundwater flow, well and drawdown analysis, and dewatering.
Area 9Surface Water and Groundwater Quality
Water-quality parameters, the dissolved-oxygen sag, eutrophication, standards and groundwater quality.
Area 10Drinking Water Distribution and Treatment
Demands and storage, distribution pressure, and the treatment train from coagulation to disinfection CT.
Area 11Wastewater Collection and Treatment
Gravity sewers and lift stations; BOD, activated sludge (F/M and MCRT), clarifiers and solids handling.
Area 12Project Sitework
Excavation and embankment, layout and curves, erosion control, retaining walls, safety and construction methods.
Pre-exam checklist
- Coverage: all 12 areas visited at least once.
- Formulas with conditions: units and applicability stated for every formula you plan to use.
- Timed practice done: at least one full timed run, every miss assigned to an area.
- Weak areas revisited after the timed run, not just re-read.
- Logistics confirmed: appointment, permitted references and current specification checked.